top of page

RAIL ROAD

20201007-04_edited.jpg

2020, Ukraine

Tram exterior and interior design

Tram exterior and interior design.
The project is ready for mass production

2010, Ukraine

Locomotive cab exterior

The project has been put into serial production

427c67_c5a987ef67a04383b5b02055e1aee4f4.jpg
427c67_81697ecc2bf944fbb32a5d3c61c61c7d-mv2.jpg

2010, Ukraine

Cab Interior Design

The project has been put into serial production

2006, Ukraine

Locomotive cab exterior

The project has been put into serial production

Примеры работ_Page_30.jpg
ДЭЛ-02.jpg

2002, Ukraine

Locomotive cab

Locomotive cab design
Interior design developed. The total duration of the project, from the first sketches to the installation of the cabin on the locomotive, was 6 months.
After carrying out a full cycle of tests, mass production was started.

bottom of page